CASE STUDY | MANN +

CASE STUDY | MANN + HUMMEL The change history allows you to track WHO changed WHAT, WHEN, WHY and WHERE in the Simatic S7 project. a network cable is connected and the communications module is installed. The machine can then run on the network. Maintenance ports are also created so that a maintenance worker or external programmer can log in to the versiondog data management system and make programming changes to the production line. This means remote maintenance is also controlled by versiondog, which helps to ensure that the most recent version is always used. Increasing efficiency through data backups The number of daily backups alone shows just how important data backup and version control are to the company. Of over 1,100 backups, around 600 are carried out daily, with a further 300 executed on a weekly basis. For each one, the seven most recent uploads are saved. These saved versions also include complete lists of all current parameters. This ensures that the most recent software version is always running on every single component in the network. As a result, maintenance work is not only easier, but also generally takes less time. At the very least, it is no longer necessary to search for the “correct” software version. For Wanninger, this represents a considerable improvement. “Repair times are now much shorter, as the system can be restored much more quickly following downtime,” he explains. “At Mann + Hummel, there have also been times when maintenance workers have had to search extensively for the latest software version. And sometimes there were no backups at all. The fast disaster recovery provided by the version control and data management system versiondog is extremely important to our day-to-day work.” With machine parameters changed and improvements made on a daily basis, it is particularly important that the latest version be accessible at any time. Page 2/4

CASE STUDY | MANN + HUMMEL Klaus Wanninger, head of electrical maintenance at Mann + Hummel “Education and a high level of knowledge are key factors in ensuring good maintenance. They learn how to use versiondog during their training so they are ready to go as soon as they are finished.“ There are some parameters, however, that cannot be changed under any circumstances. Because versiondog allows users to limit access to specific parameters, certain sources of error can be eliminated completely. Fortunately, the systems used by Mann + Hummel are not made by a huge variety of different manufacturers. Of the Siemens systems (which account for 95%), components such as IPCs and PLCs are standardised, and a sufficient number of them are available. However, they are not pre-configured. If a component has to be replaced due to a faulty CPU, for example, then the most recent image simply has to be dragged from the versiondog server onto the computer. All maintenance staff are authorised to make this sort of change and, every time they do, they must provide authorisation so that it is possible to track who changed what, where, when and why. Ultimately, therefore, a small amount of effort is required, as the changes must also be recorded in the system in writing. However, it is no longer necessary to manually update excel tables or documents, as the change reasons are entered into the project in versiondog directly. And the time saved during disaster recovery means that the effort is more than worth it. Proactive time-saving The maintenance staff work proactively and follow a strict schedule. “This leaves plenty of room for more event-driven tasks,” says Wanninger. When asked about the benefits of versiondog, Klaus Wanninger and Christian Metz, Key Automotive Account Manager and himself a former maintenance worker at a tier 1 supplier, have many stories to tell of how much time was spent looking for the correct version of PLC software. For the system to function and in order to actually save time, a certain degree of preparation and discipline is required on the part of maintenance staff with regard to documentation. The structure of the production network, the assignment of permissions and the creation of different user groups must all be clarified – potentially in consultation with the experts at AUVESY. Mann + Hummel is currently in the process of upgrading to the latest version of versiondog, version 4.0. “Fortunately,” remarks Wanninger, “this version has also incorporated some suggestions from the industry”. One of these suggestions had already been implemented in a previous version. The scripting interface allows small, customised sub-programs to be added to versiondog so that users have more options for backups or Check-Outs, for example. “We regularly come up with new requests or suggestions. After all, the world of automation is always changing.”Tools such as the WebClient, which allows users to access various report functions (e.g. versiondog eventlog or PLC status) via their normal browser, can be used in various different ways. The Mann + Hummel facility in Marklkofen, for example, has its own PC that external maintenance workers or onsite experts can use to log in to the facility via their browser. With version 4.0, the new versiondog Factory Floor Status add-on is now also in use. “We now have more accurate information for our spare parts inventory,” explains Wannin- Page 3/4

versiondog Factsheets collection

© Copyright 2020 AUVESY GmbH - All rights reserved.